So most of the hardware came in and K had the other half of the solution for this beast of a machine. I had all the 1 TB Drives but not all of them are going into this machine. I spent a good part of the day trying to rewire some of the items, but I did a horrible job so K redid it again.
The Hardware:
After all the work that was done, it turns out that he case is too short. The Silverstone 1200 Watt PSU was too long in the case to fit with the Athena Backplane for the hot-swappable Hard Drives. At this point we went to Hawally to see what our options were for a big PC case with ample space. Other then that the Gigabyte mother board is fantastic for server needs with 8 Sata ports, 8 USB ports, it doesn’t have a graphics card so I picked up a decent graphics card. It didn’t matter much since this will be automatically connected to the system through remote access. This is turning into a monster of job, but I’m loving it and it keeps looking better.